Federal, state and tribal regulatory databases searched at the minimum search distances ASTM E1527-21 uses for a Phase I
Database and historical review with EP opinion (non-ASTM)
Environmental Desktop Review (Desktop Screen)
A records-only environmental desktop review before you spend on a Phase I: regulatory databases, historical aerials, city directories and fire insurance maps, and a written Environmental Professional opinion, next business day for $199. The full fee is credited toward a Phase I on the same property ordered within 30 days.

Scope and deliverables
Know exactly what’s included.
A desktop screen tells buyers, brokers and lenders whether a Phase I is worth ordering and which records a Phase I would need to resolve.
Historical aerials, city directories and fire insurance maps for the property
Written opinion from an Environmental Professional who meets 40 CFR 312.10, with a risk indication and recommended next step
Full $199 fee credited toward a Phase I on the same property ordered within 30 days
Outside this report
- Site visit and interviews
- All Appropriate Inquiries (40 CFR 312) and ASTM E1527-21 compliance, so no support for CERCLA landowner liability protections
- Use as an SBA environmental report (SOP 50 10 8.1 builds its steps from the Environmental Questionnaire, RSRA, Transaction Screen, Phase I and Phase II)
Best for
- Buyers deciding whether to make an offer or sign a letter of intent
- Brokers screening listings
- Portfolio first passes to decide which properties need a Phase I
- Conventional loans on low-risk collateral where the lender's credit policy allows a records-only screen
Read before you order
Guides for this report.
Environmental desktop review
What an environmental desktop review can and cannot tell you.
Short answer: An environmental desktop review, or desktop screen, is a records-based look at a property: government databases and historical sources, read by an Environmental Professional, with no site visit. No ASTM standard governs it; it cannot satisfy EPA’s All Appropriate Inquiries rule or support CERCLA protection. Ours costs $199, arrives next business day and is fully credited toward a Phase I on the same property ordered within 30 days.
What a desktop screen is, and what it is not
A desktop screen tells you, before you spend more on due diligence, whether public records and the property’s history point to contamination. Government databases show regulated activity and reported releases on and near the property. Historical sources, such as aerial photographs, city directories and fire insurance maps, show earlier uses, including uses older than the programs that track them. Federal law first required owners to report underground storage tanks by May 8, 1986, and tanks taken out of operation on or before January 1, 1974 were exempt (EPA’s 1985 notification rule).
An environmental database report is the government-records part in raw form: a vendor’s map, counts of listed sites by database and distance, and the record details, as Environmental Risk Information Services (ERIS) describes its report. It is data, not an assessment: a 2023 NETR Online report says its risk ratings are “for illustrative purposes only.” A desktop screen adds the historical sources and a professional’s reading of both.
No ASTM standard defines a desktop review. ASTM subcommittee E50.02 maintains practices for the Phase I (E1527-21, and E2247-23 for forestland or rural property), the Transaction Screen (E1528-22) and the Phase II (E1903-19), but none for a desktop review (checked October 2026).
Scope therefore varies by firm. The EI Group’s desktop review, as the firm described it in 2016, includes an owner or operator interview. A3 Environmental’s screen searches federal and state databases within 1/8 mile, against the 1/2-mile to 1-mile distances EPA’s All Appropriate Inquiries (AAI) rule sets for the cleanup and leaking tank lists shown below.
A screen also cannot meet the AAI rule, which requires the Environmental Professional (EP) to conduct interviews and a visual inspection of the property along with the records reviews (40 CFR 312.21(b)). AAI is one requirement for the landowner liability protections under CERCLA, the federal Superfund law, including the bona fide prospective purchaser (BFPP) defense that matters for most buyers (40 CFR 312.1). A Phase I is the Environmental Professional’s part of that requirement, and the buyer’s own inquiries under 40 CFR 312.22, such as the search for environmental cleanup liens, complete it. Continuing obligations apply after closing, and your attorney should advise on the defense.
| AAI component (40 CFR Part 312) | Our desktop screen | Our Phase I ESA |
|---|---|---|
| Government records review (312.26) | Federal, state and tribal databases | Federal, state, tribal and local records |
| Historical sources (312.24) | Aerial photographs, city directories and fire insurance maps for the property | Back to the first developed use or 1940, whichever is earlier, including topographic maps |
| Visual inspection (312.27) | No | Property and adjoining properties |
| Interviews (312.23) | No | Owner, occupants and local agencies |
| Written result | EP opinion with a risk indication and next step | Recognized environmental conditions (RECs), data gaps and the EP declarations |
| Meets AAI | No | Yes, with the buyer’s own inquiries (312.22) |
How lenders, consultants and data vendors use desktop screens
Lenders set their own rules. The Office of the Comptroller of the Currency’s Commercial Real Estate Lending handbook expects a bank’s environmental policy to set “risk thresholds based on property type, use, and loan amount,” with methods ranging from questionnaires or screenings and records reviews to site visits and testing (pages 66-67). A bank’s own CERCLA secured creditor exemption does not require an AAI-standard evaluation, the handbook notes, though an AAI-compliant study can provide the best assessment of a property’s condition. That is why one bank may ask for a Phase I where another accepts a screen.
Consultants sell screens for that tiered use. Partner ESI describes desktop reports as an initial screen, often used “for low-risk assets or low-dollar transactions.” The EI Group names refinances, loan restructures and loans not secured by the real estate as typical fits. LightBox, which sells Environmental Data Resources (EDR) reports, offers a risk rating it markets as documentation for the loan file.
| Firm | Product, as the firm describes it | Published price | Published turnaround |
|---|---|---|---|
| A3 Environmental | Desktop screen: federal and state databases within 1/8 mile and a written opinion; no aerials or historical directories | $250 flat | 48-72 hours |
| A3 Environmental | Records package: databases, city directories, fire insurance maps and aerials (topographic maps at $415); no interpretation | $375-$415 | 5 business days |
| Phase Enviro | Environmental screen report: records search and risk analysis | $550 | Not stated on its pricing page |
| Envicon Group | Desktop review (New York and New Jersey): historical records and a light state file review; no database radius report or field visit; not an ASTM report | From $850 | Draft in 3-5 business days |
| Compyle Environmental | Desktop screen: federal, state and tribal databases, aerials, city directories and fire insurance maps, and a written EP opinion | $199 | Next business day |
Prices and terms are as listed on each firm’s own website on October 19, 2026. On that date, $199 was below every published desktop screen price we found.
When a desktop screen is the right first step
- Before an offer or letter of intent, to decide whether to pursue the property and how much due diligence time to ask for.
- Portfolio triage. Screen every property, then order Phase Is where the records point.
- Pricing a deal. A former fueling, dry cleaning or industrial use on the property means budgeting for a Phase I and possibly a Phase II. In EDR’s 2018 survey, consultants said close to one quarter of Phase I ESAs lead to a Phase II.
- Gauging what a Phase I will find. A screen cannot clear a site, but the listings and past uses it does find are the issues a Phase I would have to resolve.
- A conventional loan on low-risk collateral, where the lender’s credit policy allows a records-only screen.
When a desktop screen is not enough
- You are buying and want CERCLA protection. Only an inquiry that meets AAI, in practice a Phase I together with your own inquiries, satisfies the requirement, and EPA’s 2019 enforcement guidance says buyers cannot perform AAI after acquiring the property. This holds for all-cash buyers too: the protection does not depend on having a lender. A screen can still come first if the Phase I is finished before closing.
- Your lender requires a Phase I or names ASTM E1527-21.
- It is an SBA 7(a) or 504 loan secured by commercial real estate. SOP 50 10 8.1 builds its required steps from five report types (Environmental Questionnaire, Records Search with Risk Assessment or RSRA, Transaction Screen, Phase I and Phase II), and the word “desktop” does not appear in it. A current or known prior use matching an Appendix 6 North American Industry Classification System (NAICS) code requires a Phase I at any loan amount, unless the property is a unit in a non-industrial building of 4 or more units, where the lender may skip the NAICS check; on-site dry cleaning, current or past, still requires a Phase I followed by a Phase II for any property, including such a unit (Paragraph E.6.b). With no match, or for such a unit, a loan over $250,000 requires at least the Questionnaire plus an RSRA, and a loan of $250,000 or less may begin with the Questionnaire alone, adding an RSRA if the answers warrant it (Section A, Chapter 5, Paragraphs E.4.a and E.4.b; Appendix 4).
- The property is or was a gas station, dry cleaner, manufacturer, junkyard or landfill. ASTM says even its transaction screen, which includes a site visit, does not suit properties that handle large volumes of chemicals (ASTM E1528-22, Note 1). Order the Phase I.
RSRA vs Transaction Screen vs Phase I compares the reports lenders ask for most, and our SBA requirement checker walks through the SBA steps for a specific loan.
How to read an environmental database report
Work through a report in this order.
- Start with the summary table. Reports count records by database and distance band, such as under 1/8 mile, 1/8 to 1/4 mile, 1/4 to 1/2 mile and 1/2 to 1 mile.
- Read listings at the property’s own address first, then its neighbors. Beyond the property itself, the AAI rule looks for small and large quantity hazardous waste generators and registered tanks only on adjoining properties (40 CFR 312.26).
- Know what each list means. A listing is not the same as contamination.
| Record type | AAI search distance (40 CFR 312.26(c)) | What a listing means |
|---|---|---|
| National Priorities List (NPL, or Superfund) sites and state equivalents | 1 mile | A site on EPA’s list of national cleanup priorities |
| Resource Conservation and Recovery Act (RCRA) corrective action facilities | 1 mile | A hazardous waste facility required to clean up releases |
| State and tribal cleanup sites, including voluntary cleanup and brownfields | 1/2 mile | A site under investigation or cleanup |
| Leaking underground storage tanks | 1/2 mile | A reported tank release; read its status |
| Delisted NPL sites, engineering control registries, former CERCLIS (Superfund inventory) sites with no further remedial action planned | 1/2 mile | A past concern, sometimes with controls in place |
| Landfills and solid waste facilities | 1/2 mile | Permitted or registered waste disposal |
| RCRA small and large quantity hazardous waste generators | Adjoining properties | The business generates hazardous waste, not that it released any |
| Registered storage tanks | Adjoining properties | A tank is or was registered there, not that it leaked |
Reports may also list very small quantity generators, EPA’s category for 100 kilograms or less of hazardous waste a month (EPA); the AAI list does not name them. An EP may change any of these distances with a documented reason, including groundwater flow direction (312.26(d)). ASTM E1527-21 sets its own minimum search distances, and EPA’s comparison of the two notes one difference: E1527-21 searches engineering and institutional control registries for the property only.
- Read the status, date and substance of each release. In the December 2023 NETR Online report posted on the City of Redlands website, the one leaking tank record, 1/4 to 1/2 mile away, described a gasoline leak reported in 2003, with soil and an aquifer used for drinking water listed as the media of concern; San Bernardino County closed the case in 2008. A closed case on the property itself still matters if contamination was left in place subject to controls, such as a land use restriction: ASTM E1527-21 treats that as a controlled REC (Partner ESI glossary).
- Check direction and elevation. ERIS and EDR reports list each site’s distance, direction and elevation relative to the property. A site upgradient, where groundwater flows toward the property, generally matters more than one downgradient, because contamination can travel with groundwater. Surface topography can hint at shallow groundwater flow, a 2007 EDR report notes, but site-specific well data show it best.
- Read the unmapped list. Records with incomplete addresses go in a separate list, often called orphan sites. The same EDR report states that these sites “are not considered” in its analysis. Scan the list for the property’s street and its neighbors’ names.
- Check the data dates, and what is missing. Lists update on their own schedules; EPA’s UST Finder map shows state tank data as of 2018-2019. A missing record does not mean nothing happened: older or unreported uses can show up only in historical sources, interviews or a site visit.
Checking records yourself. EPA’s Cleanups in My Community maps the Superfund, RCRA corrective action, brownfields and federal facility cleanups EPA tracks, but excludes state and locally funded ones. Its Enforcement and Compliance History Online (ECHO) covers compliance and enforcement at regulated facilities. Leaking tank and state cleanup records are kept by each state; the Redlands record came from California’s GeoTracker.
Our desktop screen: price, timing and delivery
Our desktop screen is $199 flat for the scope shown above, delivered the next business day after you authorize, and we confirm the date before you authorize. The opinion is written by an Environmental Professional who meets 40 CFR 312.10. The price is below the published prices above because we built proprietary internal technology that collects and organizes the regulatory and historical records the day an order is authorized, so the Environmental Professional reviews an organized record instead of assembling one. If we miss the delivery date we commit to for a reason within our control, our on-time guarantee refunds the full $199.
Worked example. Suppose the screen flags a former filling station across the street and you decide to order a Phase I. The full $199 is credited toward a Phase I on the same property ordered within 30 days, so for a standard-scope property the two reports cost $1,495 in total, the price of the Phase I alone. The cost of starting with the screen is time: 1 business day for the screen plus 5 for the Phase I (counted from authorization and confirmed site access), or 6 in all if you authorize the Phase I the day the screen arrives, against 5 for a Phase I ordered first.
For the next step, see what a Phase I includes and how Phase I prices compare.
Sources
- 40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries (sections 312.1, 312.21, 312.22, 312.23, 312.24, 312.26 and 312.27), eCFR, accessed October 2026.
- Federal Register Notices Pertaining to Underground Storage Tanks (50 FR 46602, November 8, 1985, Notification Requirements for Owners of Underground Storage Tanks), U.S. Environmental Protection Agency, accessed October 2026.
- The ERIS Database Report, ERIS, accessed October 2026.
- Environmental Radius Report, ASTM E1527-21, December 20, 2023 (Appendix D9, Hazardous Materials Records Search), NETR Online, posted on the City of Redlands website, accessed October 2026.
- Subcommittee E50.02 on Real Estate Assessment and Management, standards under its jurisdiction, ASTM International, accessed October 2026.
- Can I Conduct Something Less Expensive Than a Phase I ESA? (Kerri Boddy, May 10, 2016), The EI Group, accessed October 2026.
- Comptroller’s Handbook: Commercial Real Estate Lending, Version 2.0 (pages 66-67), Office of the Comptroller of the Currency, accessed October 2026.
- Desktop Environmental Reports, Partner ESI, accessed October 2026.
- EDR Environmental Risk Screen, LightBox, accessed October 2026.
- ESRI, Environmental Screen with Risk Interpretation, A3 Environmental Consultants, accessed October 2026.
- Environmental Record Search: 5 Proven Risk-Reduction Options, A3 Environmental Consultants, accessed October 2026.
- Phase 1 Environmental Site Assessment Services and Pricing, Phase Enviro, accessed October 2026.
- Phase 1 Environmental Site Assessment in NY and NJ (service tiers), Envicon Group, accessed October 2026.
- EDR’s 2018 Benchmark Survey of Environmental Consultants: Summary of Results (page 6), Environmental Data Resources, accessed October 2026.
- Enforcement Discretion Guidance Regarding Statutory Criteria for Those Who May Qualify as CERCLA Bona Fide Prospective Purchasers, Contiguous Property Owners, or Innocent Landowners, July 29, 2019, U.S. Environmental Protection Agency, accessed October 2026.
- SOP 50 10 8.1, Lender and Development Company Loan Programs with Technical Policy Updates (Section A, Chapter 5, Paragraphs E.2, E.4.a, E.4.b and E.6.b; Appendices 4 and 6), U.S. Small Business Administration, accessed October 2026.
- ASTM E1528-22, Standard Practice for Limited Environmental Due Diligence: Transaction Screen Process (Scope, Note 1), ASTM International, accessed October 2026.
- Superfund: National Priorities List (NPL), U.S. Environmental Protection Agency, accessed October 2026.
- Learn about Hazardous Waste Cleanups (RCRA corrective action), U.S. Environmental Protection Agency, accessed October 2026.
- Categories of Hazardous Waste Generators, U.S. Environmental Protection Agency, accessed October 2026.
- Comparison of All Appropriate Inquiries Regulation, the ASTM E1527-13 Phase I Environmental Site Assessment Process, and ASTM E1527-21 Phase I Environmental Site Assessment Process (pages 10-11), U.S. EPA docket document for EPA-HQ-OLEM-2021-0946 (copy hosted by the Wisconsin Department of Natural Resources), accessed October 2026.
- Controlled Recognized Environmental Condition (CREC), Partner ESI, accessed October 2026.
- The EDR Radius Map with GeoCheck, April 12, 2007, Environmental Data Resources, posted by the Hawaii Department of Health, accessed October 2026.
- UST Finder, U.S. Environmental Protection Agency, accessed October 2026.
- Cleanups in My Community, U.S. Environmental Protection Agency, accessed October 2026.
- Cleanups in My Community: Legal Notices, U.S. Environmental Protection Agency, accessed October 2026.
- Learn More About ECHO, U.S. Environmental Protection Agency, accessed October 2026.
Clear commitments.
Before work begins.
On-time guarantee
Miss the delivery date we commit to for a reason within our control, and we take $250 off, or refund the full fee if it is under $250.

How it works
A clear path from address to answer.
- Start here
Tell us about the property
Address, report type and timeline. Start your request online, with no payment required.
- 1 business hour
Confirm your scope, price and date
A project manager reviews the request and sends your fixed proposal. Work begins after you authorize.
- Records review
Research and professional review
Regulatory and historical sources are reviewed against the requirements of your report.
- Next business day
Your report, ready for the next step
Receive your report and supporting documentation. We stay available for questions from you and your lender.
Compare reports
Which report do you need?
Start with the scope your transaction requires. The full fee of a desktop screen, RSRA or Transaction Screen is credited toward a Phase I on the same property ordered within 30 days.
| Report | Desktop Screen$199 flatNext business day | SBA RSRA$695 flat2 business days | Transaction Screen$795 flat4 business days | Phase I ESA$1,495 flat5 business days |
|---|---|---|---|---|
| Standard | Database + historical review, EP opinion | SBA SOP 50 10 8.1 | ASTM E1528-22 | ASTM E1527-21 / AAI |
| Site visit | No | No | Yes | Yes |
| Signed by an Environmental Professional | Yes | Yes | Yes | Yes |
| Accepted by the SBA | No | Yes | Yes | Yes |
| Performed to EPA’s AAI rule (one requirement for CERCLA landowner protections) | No | No | No | Yes |
| Best for | First look before spending on a Phase I; buyers, brokers, low-risk conventional loans | SBA loans over $250,000 with no Appendix 6 NAICS match | SBA loans when the current owner or operator will not sign the Environmental Questionnaire; car-wash-only sites | Commercial purchases and loans; SBA loans with an Appendix 6 NAICS match (gas station loans add Appendix 7 requirements); buyers seeking CERCLA landowner protections |
| Request report | Order report for Desktop Screen | Order report for SBA RSRA | Order report for Transaction Screen | Order report for Phase I ESA |
Desktop Screen$199 flat
- Price
- $199 flat
- Turnaround
- Next business day
- Standard
- Database + historical review, EP opinion
- Site visit
- No
- Signed by an Environmental Professional
- Yes
- Accepted by the SBA
- No
- Performed to EPA’s AAI rule (one requirement for CERCLA landowner protections)
- No
- Best for
- First look before spending on a Phase I; buyers, brokers, low-risk conventional loans
SBA RSRA$695 flat
- Price
- $695 flat
- Turnaround
- 2 business days
- Standard
- SBA SOP 50 10 8.1
- Site visit
- No
- Signed by an Environmental Professional
- Yes
- Accepted by the SBA
- Yes
- Performed to EPA’s AAI rule (one requirement for CERCLA landowner protections)
- No
- Best for
- SBA loans over $250,000 with no Appendix 6 NAICS match
Transaction Screen$795 flat
- Price
- $795 flat
- Turnaround
- 4 business days
- Standard
- ASTM E1528-22
- Site visit
- Yes
- Signed by an Environmental Professional
- Yes
- Accepted by the SBA
- Yes
- Performed to EPA’s AAI rule (one requirement for CERCLA landowner protections)
- No
- Best for
- SBA loans when the current owner or operator will not sign the Environmental Questionnaire; car-wash-only sites
Phase I ESA$1,495 flat
- Price
- $1,495 flat
- Turnaround
- 5 business days
- Standard
- ASTM E1527-21 / AAI
- Site visit
- Yes
- Signed by an Environmental Professional
- Yes
- Accepted by the SBA
- Yes
- Performed to EPA’s AAI rule (one requirement for CERCLA landowner protections)
- Yes
- Best for
- Commercial purchases and loans; SBA loans with an Appendix 6 NAICS match (gas station loans add Appendix 7 requirements); buyers seeking CERCLA landowner protections
Your questions
Questions about the Desktop Screen.
Have a question about your property or transaction? Talk to our team.
What is an environmental desktop review?
An environmental desktop review, also called a desktop screen or desktop environmental report, is a records-based look at a property's environmental risk. An Environmental Professional reviews government databases for regulated activity and reported releases on and near the property, plus historical sources such as aerial photographs, city directories and fire insurance maps, then writes an opinion. There is no site visit, though some firms add an owner interview. No ASTM standard governs the review, so scope varies: ask which records are searched and how far from the property.
Is a desktop screen the same as a Phase I ESA?
No. A Phase I under ASTM E1527-21 adds a site visit, interviews and broader historical research, and it is built to satisfy EPA's All Appropriate Inquiries rule, one requirement for CERCLA landowner liability protections such as the bona fide prospective purchaser defense. A desktop screen cannot meet that rule. If you are buying and want that protection, you need a Phase I and your own inquiries completed before closing, even when your lender does not require one, and continuing obligations apply after you buy.
Will my lender or the SBA accept a desktop screen?
Some lenders do: banks scale due diligence to property type, use and loan amount, and some accept a records-only screen on low-risk collateral. The SBA does not: SOP 50 10 8.1 uses only the Environmental Questionnaire, RSRA, Transaction Screen, Phase I and Phase II. Which one a loan needs depends on the property's current and past uses and the loan amount, and on-site dry cleaning, current or past, requires a Phase I followed by a Phase II.
How much does a desktop screen cost?
Prices published on firms' own websites in October 2026 included $250 for A3 Environmental's desktop screen (48-72 hours), $550 for Phase Enviro's environmental screen report and from $850 for Envicon Group's desktop review. A3 Environmental listed a database package alone, with no professional interpretation, at $375-$415. Compyle Environmental's desktop screen is $199, delivered the next business day, and the full fee is credited toward a Phase I on the same property ordered within 30 days.
Is an environmental database report enough on its own?
Usually not. A database report is a vendor's list of government records within set distances of the property, and it is data, not an assessment: NETR Online's disclaimer, for example, calls its risk ratings illustrative only. It will not show uses that predate environmental programs or were never reported, and records with incomplete addresses often sit in a separate unmapped list. A desktop screen adds historical sources and an Environmental Professional's reading; a Phase I adds a site visit and interviews.
Can I check environmental records myself for free?
Partly. EPA's Cleanups in My Community maps the Superfund, RCRA corrective action, brownfields and federal facility cleanups EPA tracks, but excludes state and locally funded cleanups. EPA's Enforcement and Compliance History Online (ECHO) covers compliance and enforcement at regulated facilities, and its UST Finder shows state tank data as of 2018-2019. Leaking tank and state cleanup records are kept by each state, such as California's GeoTracker. A commercial database report compiles the federal and state lists into one search, and historical sources show uses the databases never captured.
Move your transaction forward.
Scope, price and delivery date confirmed before you authorize. No payment online.