The Phase I ESA 180-day rule: how long a Phase I is good for

By Jonathan Miranda, Co-founder and CEO, Compyle Environmental / 14 min read / Updated

Short answer: Under the Phase I ESA 180-day rule in 40 CFR 312.20, five parts (interviews, cleanup lien search, government records review, site visit and Environmental Professional’s declaration) must be done or updated within 180 days before you take title, and all work within one year. Both clocks run from the work dates, not the report date. SBA loans add a one-year test measured to the loan number date.

In practice, a Phase I is good as is for 180 days from the earliest of those five parts, and for up to one year from its oldest work if those five parts are updated. The rules below are as published in October 2026. To check your own dates, use the Phase I validity calculator.

What the Phase I ESA 180-day rule requires

The All Appropriate Inquiries (AAI) rule, 40 CFR Part 312, is the EPA regulation that defines the environmental inquiry a buyer must complete before acquiring a property to qualify for the landowner liability protections in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the federal Superfund law. A Phase I Environmental Site Assessment (ESA) performed to ASTM E1527-21, which section 312.11 recognizes as a way to meet the rule’s inquiry requirements, is the report that documents the Environmental Professional’s (EP’s) part of that inquiry. Section 312.20 sets two time limits:

Time limit What must fall inside it Usually done by Rule
180 days before acquisition Interviews with past and present owners, operators and occupants The EP or staff the EP supervises 312.20(b)(1); 312.23
180 days before acquisition Search for recorded environmental cleanup liens You, unless you hire the EP to run it 312.20(b)(2); 312.25
180 days before acquisition Review of federal, tribal, state and local government records The EP 312.20(b)(3); 312.26
180 days before acquisition Visual inspection of the property and adjoining properties (the site visit) The EP or staff the EP supervises 312.20(b)(4); 312.27
180 days before acquisition The EP’s signed declaration The EP 312.20(b)(5); 312.21(d)
One year before acquisition Everything else: historical sources, the rest of the EP’s inquiry, and your own inquiries into specialized knowledge, purchase price compared with fair market value, and commonly known information The EP and you 312.20(a); 312.22

Acquisition means the day you take title (40 CFR 312.10). EPA considered tying the clock to the purchase agreement instead and decided against it, noting that the period between signing and title transfer may be the most convenient time to get access to the property and do the work (70 FR 66083).

EPA’s reason for the one-year limit is in the 2005 rule’s preamble: “a year is sufficient time for conditions at a property to change” (70 FR 66083). For work between 180 days and one year old, “only certain aspects” must be refreshed (70 FR 66075), and those are the five in the table.

Some summaries, including EPA’s own AAI web page, list four time-sensitive parts and leave out the declaration. The regulation lists five, and so does E1527-21 (section 4.6.2). The fifth one matters in practice: an update is not complete until an EP signs a new declaration.

Which date starts each clock

Not the date on the cover. ASTM E1527-21 says the report date generally does not show when the individual parts were completed and should not be used to test either limit (section 4.6.3). A report is written after the work, so its date makes the work look younger than it is.

  • The 180-day clock starts at the earliest of the five dates. All five must be inside the window, so the oldest one decides. E1527-21 requires the report to list the dates of the interviews, the government records review, the site visit and the declaration (section 4.6.1).
  • The one-year clock starts at the oldest work in the whole inquiry. Section 312.20(a) applies the one-year limit to all of the inquiry, and E1527-21 says every other part must be done within one year (section 4.6.3). That includes historical research and your own inquiries, which can be older than the five dated parts.

Answers that count from the report date, or from the site visit alone, get this wrong. If the records review came before the site visit, counting from the site visit overstates the time left.

To find your dates:

  1. Read the component dates the report lists for the interviews, records review, site visit and EP declaration.
  2. Add the date of the cleanup lien search. It is your responsibility as the user, and E1527-21 requires the report to show its date only if you hired the EP to run it (section 4.6.1). If a title company ran it for you, use that date.
  3. Note when the historical research was done (the date the aerial photographs, maps and directories were reviewed, not the years those sources show) and the dates of any earlier report the work builds on. For an updated report, the dates of any original work the update did not redo, such as historical research, still count toward the one-year limit.
  4. If a date is missing, ask the consultant for it in writing before you rely on the report.

Does a Phase I expire? Its shelf life at closing

Neither the AAI rule nor ASTM E1527-21 sets a fixed expiration date for a Phase I. E1527-21 treats it as a question of the report’s continued viability (section 4.6). Whether the report still counts toward the landowner liability protections depends on how old its work is on the day you take title:

Age of the work on the closing date Status under 40 CFR 312.20 What to do
Earliest of the five parts is 180 days old or less, and all work is within one year Usable as is Close, and keep the report with its component dates in your file
Earliest of the five is more than 180 days old, but all work is within one year Needs an update Update the five parts before closing (312.20(b) and (c))
Any part of the work is more than one year old All parts must be reviewed and updated Order a new Phase I, which may reuse the old report’s information after a current investigation (70 FR 66083; E1527-21, section 4.7.1)

The regulation does not say how to count the days. Our calculator treats day 180 as the last day a report is usable as is, and the same calendar date one year after the oldest work as the last day an update can help. Do not plan a closing for either last day, because a one-day slip changes the answer.

The work must also be finished before title passes. EPA’s enforcement guidance says purchasers who want a landowner liability protection cannot perform all appropriate inquiries after acquiring the property (EPA Common Elements guidance, p. 5). A Phase I finished the week after closing does not count.

Worked example: one purchase, four closing dates

Take a warehouse purchase. The EP’s government records review and historical research are done on Monday, February 2, 2026, which makes that date both the oldest work in the inquiry and the earliest of the five parts. The site visit and interviews follow on February 9, the EP signs the declaration on February 13, and the buyer’s title company runs the lien search on February 17. Every count starts from February 2: the 180-day window ends Saturday, August 1, 2026, and the one-year limit ends Tuesday, February 2, 2027.

Closing date Days after February 2, 2026 Result
Monday, June 15, 2026 133 Usable as is. All five parts are within 180 days.
Wednesday, September 30, 2026 240 Update needed. The five parts are past 180 days, but all work is within one year.

For the September closing, the buyer orders an update: a new records review on September 8, 2026, the site visit and interviews on September 10, a new lien search on September 14 and a new declaration on September 15. The 180-day window now runs from September 8 to Sunday, March 7, 2027. The historical research was not redone and still dates from February 2, 2026, so the one-year limit still ends February 2, 2027. Then the closing slips again.

Closing date, after the update Days after the update’s earliest part Days after the original work Result
Friday, January 29, 2027 143 361 Usable. The five parts are within 180 days and all work is within one year.
Monday, March 1, 2027 174 392 Not usable as is. The historical research is more than one year old, so it must be brought current too.

The second row is the trap. The update’s own dates look fine, but they cannot carry the report past one year from the original work. If a closing might move beyond that date, ask the EP to bring the older work current as well, not only the five parts.

SBA loans: one year from the loan number date

U.S. Small Business Administration (SBA) 7(a) and 504 loans follow SOP 50 10 8.1, published September 25, 2026 and effective October 1, 2026. SBA’s September notice applies it to applications received on or after October 1, 2026; an earlier August notice said loan numbers issued on or after that date. SBA posts the SOP only as a Word file.

The core rule is one sentence in Section A, Chapter 5, Paragraph E.3: “Environmental Investigation Reports must be dated within one year of the date of issuance of the SBA loan number.” Appendix 4 repeats it for the Environmental Questionnaire, the Records Search with Risk Assessment (RSRA), the Transaction Screen and the Phase I. Paragraph E.6.a applies the same one-year limit to the lead risk assessment and drinking water tests required for child-occupied facilities built before 1978. The 2025 SOP, as in effect from June 1, 2025, used the same rule.

For the Phase I, Appendix 4 addresses EPA’s clock directly: SBA will accept for review an otherwise AAI-compliant Phase I dated within one year of the loan number date, “notwithstanding the EPA’s regulations on updating Phase I ESAs after 180 days.” The next sentence is a warning: “Parties may still wish to strictly comply with EPA’s regulatory timeframes to avoid jeopardizing legal and regulatory protections.” The acceptance rule does not apply to liquidations under SOP 50 55 or SOP 50 57.

SBA’s test differs from EPA’s in two ways. It is measured to the date the loan number is issued, not to the closing, and it refers to the date of the report, not to the component dates. The SOP does not say whether a report dated after the loan number is acceptable, so ask your lender if yours is.

In an SBA purchase, then, two tests apply. Take one deal with these dates:

Date Event
Monday, April 6, 2026 Government records review and historical research: the earliest of the five parts and the oldest work in the inquiry
Friday, April 17, 2026 Report date
Friday, November 20, 2026 SBA loan number issued
Friday, January 22, 2027 Closing
  • SBA’s test: met. The report is dated 217 days before the loan number was issued, within one year. It would meet SBA’s test for loan numbers issued through April 17, 2027.
  • The buyer’s CERCLA test: update needed. The closing is 291 days after April 6, 2026. The 180-day window closed on October 3, 2026, and the one-year limit runs to April 6, 2027. The five parts must be updated before closing for the Phase I to count toward the buyer’s landowner protections.

That gap is what SBA’s warning points to. For most buyers the relevant protection is the bona fide prospective purchaser (BFPP) defense (42 U.S.C. 9601(40)). A current Phase I satisfies one of its requirements; the defense also depends on your own inquiries before closing and on continuing obligations after it, such as required notices, reasonable steps to stop or prevent releases, and cooperation with response actions. Whether you qualify is a question for your attorney.

SBA’s reliance letter allows for updated reports: the Appendix 5 letter, required with every Transaction Screen, Phase I and Phase II, has a box for “A Phase I (or an Updated Phase I).” An update done before closing will usually be dated after the loan number, and the SOP does not say whether that order matters, so confirm with your lender. An RSRA needs no reliance letter, and the form has no RSRA option. The SBA environmental requirements guide explains which report a loan needs.

Other lenders, refinances and leases

The federal clocks govern the buyer’s inquiry, which is one condition of the CERCLA protections, not the only one; they do not bind a lender. A lender’s own protection, the secured creditor exemption, does not depend on AAI, although EPA notes that banks may protect collateral value by requiring borrowers to qualify for the landowner protections (EPA lender liability fact sheet, p. 3).

The handbook that Office of the Comptroller of the Currency (OCC) examiners use for national banks and federal savings associations sets no report-age rule either. It expects a bank’s environmental policies to “reflect adequate consideration of the EPA’s AAI rule” and to set risk thresholds, by property type, use and loan amount, for when and what due diligence is required (Comptroller’s Handbook, Commercial Real Estate Lending, pp. 66-67). Your lender’s credit policy sets the age it accepts, so ask for the limit in writing.

Some articles say most lenders accept a report up to six months old. We found no data behind that claim, and the only published six-month limit in our research is Freddie Mac’s. The published rules, as of October 2026:

Program Age limit Measured to Source
Federal AAI rule Five parts within 180 days; all work within one year The date you take title 40 CFR 312.20
ASTM E1527-21 The same two limits Acquisition, or the date of the intended transaction for a lease or refinance Sections 4.6.1-4.6.3
SBA 7(a) and 504 Report dated within one year The date SBA issues the loan number SOP 50 10 8.1, Section A, Chapter 5, Paragraph E.3; Appendix 4
Freddie Mac multifamily Report dated within six months; Freddie Mac may also require an update if the report is dated more than six months before the Letter of Commitment (or Acceptance or Modification Letter) for an early rate-lock application is issued Delivery of the full underwriting package Seller/Servicer Guide, Chapter 61, 61.2(b)
Fannie Mae multifamily Five parts within 180 days; other parts within one year The mortgage loan origination date Form 4251, Section 1.B
Banks and credit unions Set by each lender Varies The lender’s written credit policy

A refinance involves no acquisition, so the AAI rule’s clock has no date to run to. E1527-21 measures a lease or refinance to the date of the intended transaction (section 4.6.1), and the lender’s rules decide. For example, if the full underwriting package for a Freddie Mac refinance is delivered on Thursday, November 19, 2026, a report dated April 24, 2026 is almost seven months old that day and would need updating. Freddie Mac’s rule, like SBA’s, is written in terms of the report date, not the component dates.

Your closing slipped: update, new Phase I or reliance letter

Each fix solves a different problem:

Your situation What fixes it What it does not do With Compyle Environmental
The report is within its limits, and a new lender or the SBA must rely on it A reliance letter from the firm that wrote the report It does not update the report or complete AAI for a new buyer $99 per added party, such as a new lender, for reports we wrote; the letter is issued within 1 business day of a complete request
Earliest of the five parts is past 180 days; all work is within one year A Phase I update It does not carry the report past one year from the original work $595 for a report we wrote, 4 business days from authorization and confirmed site access
Any work is more than one year old A new Phase I, which can draw on the old report It replaces the old report rather than extending it $1,495 flat for standard-scope properties, 5 business days from authorization and confirmed site access
You are buying with the seller’s Phase I Your own user inquiries, a reliance letter, and an update if the five parts are past 180 days A reliance letter alone does not satisfy AAI for you If we wrote the report: reliance at $99 per added party, with the letter issued within 1 business day of a complete request, plus a $595 update if the five parts are past 180 days. If another firm did, reliance must come from that firm; we can usually update its report and confirm scope and price within 1 business hour of seeing it

What an update involves. It redoes the five time-sensitive parts in the first table: new interviews, a new government records review, a new site visit, a current lien search (yours, unless you hire the EP to run it) and a new EP declaration in an updated report. It also brings the earlier information current for changes at the property and for what you and the EP now know, as 312.20(c)(4) requires.

Our Phase I update includes a new government records search, a new site visit and new interviews, a reissued report with a new declaration by an Environmental Professional who meets 40 CFR 312.10, and the SBA Appendix 5 reliance letter for an updated Phase I. The historical research is kept from the original report, and the cleanup lien search stays with you as the user under E1527-21. We can usually update another firm’s report if it meets E1527-21 and we can review it and perform the update components ourselves. Past one year, order a new Phase I.

Using the seller’s report, or any report prepared for someone else. Section 312.20(d) allows it if the report meets the rule’s objectives and performance factors and you review it, complete your own inquiries into specialized knowledge, purchase price and commonly known information (312.28 to 312.30), and update it as needed. In EPA’s words, it “is not sufficient to wholly adopt” an earlier inquiry “without any review” (70 FR 66084).

Relying on the report is a separate, contractual question. E1527-21 gives no right to rely on a prior assessment (section 4.7.1); a reliance letter from the firm that wrote it does. Fannie Mae multifamily goes further: the borrower may not rely on the Phase I the lender ordered (Form 4251, Section 1.D). The SBA reliance letter guide explains SBA’s fixed form.

When to order so you do not need an update

With 180 days of room, the simplest way to avoid an update is to order once the purchase agreement is signed and the closing date is realistic, not at the letter of intent.

  1. Start from a realistic closing date, including lender and SBA processing time. If the date is uncertain, make sure the 180 days reach the latest likely closing date.
  2. Order inside your due diligence period. Our standard Phase I takes 5 business days from authorization and confirmed site access; how long a Phase I takes covers each step and what can delay it.
  3. Keep your lien search in the same window. Its date is one of the five, so a lien search run months earlier can force an update on its own.
  4. Recheck the dates the day the closing moves, not the week before closing. An update needs a new site visit, which has to be scheduled.
  5. For an SBA loan, check both tests: the report date against the loan number date, and the component dates against the closing date.

Enter your dates in the Phase I validity calculator. It applies both federal clocks, lets you enter the oldest work separately for an updated report, and has an SBA option that checks the report date against the loan number date.

Sources

  1. 40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries, eCFR (sections 312.1, 312.10, 312.11 and 312.20 to 312.30; current as of October 16, 2026), accessed October 2026.
  2. Standards and Practices for All Appropriate Inquiries, final rule, 70 FR 66070 (November 1, 2005), U.S. Environmental Protection Agency, Federal Register, accessed October 2026.
  3. Brownfields All Appropriate Inquiries, U.S. Environmental Protection Agency (last updated May 7, 2026), accessed October 2026.
  4. ASTM E1527-21, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, ASTM International (public scope and significance sections), accessed October 2026.
  5. Enforcement Discretion Guidance Regarding Statutory Criteria for Those Who May Qualify as CERCLA Bona Fide Prospective Purchasers, Contiguous Property Owners, or Innocent Landowners (“Common Elements”), U.S. Environmental Protection Agency, July 29, 2019, accessed October 2026.
  6. SOP 50 10 8.1, Lender and Development Company Loan Programs with Technical Policy Updates, U.S. Small Business Administration (effective October 1, 2026; .docx), accessed October 2026.
  7. Information Notice 5000-882227, Issuance of Technical Updates to SOP 50 10 8.1, U.S. Small Business Administration, September 25, 2026, accessed October 2026.
  8. Information Notice 5000-880695, Issuance of SOP 50 10 8.1, U.S. Small Business Administration, August 14, 2026, accessed October 2026.
  9. 42 U.S.C. 9601, Definitions, U.S. Code, 2024 edition, U.S. Government Publishing Office, accessed October 2026.
  10. Lender Liability and Applicability of All Appropriate Inquiries, U.S. Environmental Protection Agency fact sheet EPA-560-F-23-006 (2023), accessed October 2026.
  11. Comptroller’s Handbook: Commercial Real Estate Lending, Office of the Comptroller of the Currency (Version 2.0, March 2022, as of March 20, 2025), accessed October 2026.
  12. Multifamily Seller/Servicer Guide, Chapter 61: Environmental Requirements, Freddie Mac (Guide Bulletin update of August 25, 2026), accessed October 2026.
  13. Form 4251, Environmental Due Diligence Requirements (April 2025), Fannie Mae Multifamily (the same form is in the Fannie Mae Multifamily Guide), accessed October 2026.

Related guides

Keep reading.

Explore the services

Related reports

ASTM E1527-21

Phase I ESA

Lender-ready Phase I in 5 business days for $1,495 flat, nationwide. Signed by an Environmental Professional who meets 40 CFR 312.10. SBA reliance letter included.

$1,4955 business days
Explore Phase I ESA

Prices apply to standard-scope properties. See prices, rush terms and standard scope.

Your questions

Questions we are asked.

Have a question about your property or transaction? Talk to our team.

What is the Phase I ESA 180-day rule?

It is the requirement in 40 CFR 312.20(b) that five parts of a Phase I be conducted or updated within 180 days before you take title: interviews with owners, operators and occupants; the search for recorded environmental cleanup liens; the government records review; the visual inspection of the property and adjoining properties; and the Environmental Professional's declaration. The rest of the inquiry must be done within one year. Meeting both limits is part of qualifying for the CERCLA landowner liability protections.

Does a Phase 1 environmental study expire?

Not on a fixed date. Under the federal All Appropriate Inquiries rule, a Phase I counts toward the CERCLA landowner liability protections only if, on the day you take title, its five time-sensitive parts were done or updated within the prior 180 days and none of its work is more than one year old. Past one year, a new inquiry can still reuse its information. Lenders set their own limits; SBA requires a report dated within one year of the date the SBA loan number is issued.

Does the 180-day clock start on the Phase I report date?

No. ASTM E1527-21 says the report date generally does not show when the work was done and should not be used to test either limit. The 180 days run from the earliest of the five component dates. The report must list the dates of the interviews, records review, site visit and Environmental Professional's declaration, but the lien search date only if you hired the Environmental Professional to run it; otherwise, add your own search's date. The one-year limit runs from the oldest work in the whole inquiry.

Do lenders and the SBA use the same clock as EPA?

No. SBA requires environmental reports to be dated within one year of the date the SBA loan number is issued, and will accept for review a Phase I that otherwise meets EPA's All Appropriate Inquiries rule and is dated within that year, notwithstanding EPA's 180-day update rule, while warning that parties may still want to meet EPA's timeframes. Freddie Mac multifamily wants the report dated within six months before the full underwriting package is delivered. Fannie Mae multifamily measures 180 days to origination. Banks set their own policies.

My closing slipped past 180 days. What do I need?

For the CERCLA landowner protections, if all of the work is still within one year of the new closing date, you need an update of the five time-sensitive parts: new interviews, a new government records review, a new site visit and a new Environmental Professional declaration, plus a current lien search. If any work is more than one year old, the whole inquiry must be brought current. Compyle Environmental updates its own reports for $595 in 4 business days from authorization and confirmed site access.

Does a Phase I update reset the clock?

Only the 180-day clock. An update restarts it from the earliest refreshed component date, but the one-year limit still runs from the oldest work in the original inquiry, such as the historical research. The updated report can be used only for closings through one year after that work, unless the update also brings that older work current. For example, original work dated February 2, 2026 and an update in September 2026 still stop at February 2, 2027.